News

START UP OF ERATIC´S FIRST CONGENRATION PLANT USING BIOMASS IN ROMANIA



The new cogeneration plant, located in the north of Romania, will use bark, sawdust and other biomass as fuel to produce hot thermal oil that will fuel the ORC module  and a super-heated water producer, generating  1.4 MW  of electricity and  6.5 MW of  thermal energy in the form of hot and superheated water. The heat generated by the plant will be utilized by the plant in heat treatment processes of the wood such as drying, pressing and firing mainly wood and for heating of buildings. The electricity generated will be sold to the grid. This new installation will provide a significant saving  in fuel and have a new source of revenue, exploiting all manufacturing waste, renewable biomass, thus increasing the overall energy efficiency of the factory.

I accept the conditions of the Privacy Policy

Contact us

Contact us for ...

I accept the conditions of the Privacy Policy

Acepto recibir las últimas novedades sobre Innergy.